Data before models.
Asset decisions depend on governed data, not geometry. A model built on undefined data structures is an expensive picture. Define the schema, the metadata and the quality rules first, and the model is useful the day it is finished rather than the year after.
Data re-entry, inconsistency and information loss, across every project stage.
GeoBIM framework, Slovenia
Borehole, laboratory and design data moved out of document exchange into a governed, model-linked environment. Database-first in PostgreSQL, with templates standardised before any 3D model entered the workflow.
Elea iC · one of the first operational GeoBIM frameworks in the countryDigital twin demonstrator
FAIR principles applied so data stayed accessible, traceable and reusable independently of any platform. BIM treated as structured context with defined semantics, not as the data store.
TNO · vendor-agnostic foundation for lifecycle reuse